Laserfiche WebLink
Bowie Resources Limited <br />Bowie No. 1 Mine <br />2002 Annual Hydrology Report <br />SM11 <br />Monitoring Well SM-11 <br />Depth - 46.5' <br />Elevation - 7242.65 <br />Ground Water <br />Initiated 8/8/1986 8/8/1986 <br />Activated <br />Date 12/9/2002 6/26/2002 <br /> <br /> <br />Summary Information <br />Baseline Operation <br />Min Ave Max Min Ave Max <br />Static Water Level Feet 30.4 36.2 87.8 36.08 38.05 <br />Water Elevation Feet 7154.9 7206.4 7212.3 7206.57 7204.6 <br />Temperature Celsius 5 10.6 20.0 9 10.9 <br />Conductivi umhos/cm 1400 1880 2600 2400 2300 <br />pH su 5.8 7.6 8.5 7.5 7.5 <br />Field Comments <br />UNITS <br />Shallow monitoring wells SM-1 through SM-11 were constructed in 1985 in order to gather additional information <br />on alluvial/colluvial deposits within the permit boundary. They are depicted on Map 4-1. <br />Baseline Information Collection initiated on a/9/86 and not yet consideretl complete. <br />Paint SM11 has not been influenced by mining. <br />Monitoring Point Table 19 <br />(Revised 03/04) <br />The area of concern for monitoring point SMt t has not been affected by the mining operation. Therefore, all recorded <br />monitoring events are considered Baseline. <br />