Laserfiche WebLink
RECEIVED <br />DEC 2 22005 <br />~p./~~~ Division of Minerals and 6eoloAY <br />B~LMA <br />~rres /89/ <br />Stevens Mine Annual Report <br />Permit #M-1996-064 <br />Acme Brick -Denver <br />Reclamation is being completed on the north side of Phase #1. Additional <br />overburden placement and topsoil was used in the reclamation. Seeding is <br />scheduled in the early spring of 2006. In 2005, some mining goes over into <br />Phase #2. Mining in 2006 will be confined to the benches already <br />established in 2005. Approximately five acres have been disturbed to date. <br />Albert Templeton <br />MiningBnvironmental/Preparation Supervisor <br />12-18-OS <br />