Laserfiche WebLink
Snowcap Coal Company, Inc. - 2 - 2005 Annual Reclamation Report <br />Cameo Refuse Disposal Area No. 2 Topsoil Piles (No. 25 Below) 2.9 <br />Conveyor Corridor from Xcel Culvert north to Haul Road #3 (No. 26 Below) 2.7 <br />Conveyor Corridor from Xcel Culvert south to. Transfer Bldg #2 and <br />east of Colorado River (No. 27 Below) 1.6 <br />Total 135.8 <br />Areas Permanently disturbed are as follows: <br />Descriution <br />Access Road to No. 2 West Portals (No. 21 Below) 3.8 <br />Haul Roads to CRDA 1, 2 and 3 3.4 <br />Access Road #2 (Through North Decline) 0.4 <br />Haul Road #3 at UTL (16' Width) 0.9 <br />Total 8.5 <br />Acres Disturbed by Mining Activities 241.7 <br />Less Previously Reclaimed Areas 135.8 <br />Less Permanently Disturbed Areas 8.5 <br />Equals Remaining Reclamation Acres 97.4 <br />(c) Area back filled and graded - 0 Acres during 2005. <br />(d) Area Top-soiled - 0 Acres during 2005. <br />(e) Area Seeded - 0 Acres during 2005. <br />Area Re-Seeded - 4.0 Acres during 2005. <br />Whitetop was treated in April, using Curtail, at the Roadside South and CRDA1. <br />Russian Knapweed was treated in September, using Curtail, at the UTL and the <br />Overland Conveyor. <br />Cheatgrass was treated in November, using Plateau/Roundup, at the North <br />Decline (see #5 below). <br />(f) Areas Seeded up through 2005. (Permanent) <br />Blue Flame Mine -Deleted -Reclamation work was performed voluntarily <br />and therefore not required for this report. <br />2. Permanent Flood Control Dike -between the overland conveyor and the <br />river (see Permanent Flood Control Dike - TR01, Volume 7). Located in <br />SW'/+SE'/<, Section 27, Township 10 South, Range 98 West, 6`h P.M. <br />Area - 2.8 acres <br />Date -Fall 1985 <br />Seed Mix - No seed mix information on file. <br />