Laserfiche WebLink
Snowcap Coal Company, Inc. - 8 - 2005 Annual Reclamation Report <br />25. Cameo Refuse Disposal Area Topsoil Piles -These piles were used for <br />top soiling the CRDA2 during final reclamation activities. Located in the <br />SE'/<, Section 28, Township 10 South, Range 98 West, 6`" P.M. <br />Area - 2.9 acres <br />Date -April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />26. Conveyor Corridor -The conveyor corridor, from the Xcel culvert north to <br />Haul Road #3 was graded to approximate original contours and reseed. <br />Located in SE'/<, Section 27 and NW'/<, Section 34, Township 10 South, <br />Range 98 West, 6`h P.M. <br />Area - 2.7 acres <br />Date -July 2003 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />27. Conveyor Corridor -The conveyor corridor, from the Xcel culvert south <br />to Transfer Building #2 and east of Colorado River where conveyor tube <br />crossed river was graded to approximate original contours and seeded. <br />Located in SE'/<, Section 27 and NWY<, Section 34, Township 10 South, <br />Range 98 West, 6`h P.M. <br />Area - 1.6 acres <br />Date -March 2004 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />2. Vegetation Studies -None. <br />3. Other -None. <br />