My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP51063
DRMS
>
Back File Migration
>
Report
>
REP51063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:55:53 AM
Creation date
11/27/2007 1:00:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987127
IBM Index Class Name
Report
Doc Date
4/30/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III ~ <br />Notice of Intent to Continue Mining Operations <br />110c Construction Materials Annual Report <br />Pe rmittee Name: <br />Permit No. . <br />Operation Name: <br />Anniversary Date: <br />Total: <br />1. a. Permitted acreage <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />~~ ~% <br />o~ <br />RECEIVED °>~~~r <br />V~ <br />APR 3 0 1998 ~ <br />Butala Construction Company <br />M-87-127 <br />Butala Pit DivisionotMineralsBGedo9Y <br />May 11, 1998 <br />5225.00 (Due on your Anniversary Date) <br />6. 3 b. County where mine is located: C h a f f e e <br />Has this mine been granted TEMPORARY CESSATION STATUS? <br />Does this mine operate MORE or LESS than 180 days per year? <br />Does this mine have a phased reclamation plan? <br />Total acres affected during the report year:` <br />Total acres reclaimed for the report year:* <br />Total number of acres in topsoil replacement stage: <br />a. Average thickness of topsoil replaced: <br />Total number of acres seeded: <br />a. List species seeded & seeding rate Eor report year on back <br />For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />YES NO <br />XDP~X LESS <br />YES XI~ <br />5.0 <br />,L 0.- - <br />1 !1 <br />4 ~~ <br />The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* NOne <br />10. Estimated total acres to be affected in the next report year:* <br />11. COMMENTS: <br />5.0 <br />* Please show the location of the acreage for items 4 - 6 on your map*'. Indicate <br />the phases of the reclamation which have been completed, correlated with your timetable <br />For phased operations show dates extraction ceased and dates reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 through <br />6, then a new map is unnecessary. However, this must be stated above. <br />Signature :~~--r if ~ L~K C.'z i Date: Apri 1 27, 1998 <br />Please type or print current contact name <br />contact Name: Frdnk 8utdld <br />Company: <br />Address: <br />mailing address, and phone number below: <br />Phone: X719 ) 539-2521 <br />FAx No: (719-) 539-2523 <br />Butala Construction <br />P. 0. Box 907 <br />Salida, CO 81201 <br />Federal Tax ID No. or social security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.