Laserfiche WebLink
<br />SLOPE STABILITY <br />INTERIM INSPECTION REPORT <br />AREA <br />TIME <br />1. Wadge Highwall Drainage Fill <br /> <br />Debris, organic matter, coal, etc., present in DATE Nov. 27, 1990 <br />WEATHER Cloudy 30° F <br />fill None Visible <br /> <br />2. General <br />the SPn gradation and characteristics of material NO app <br />tPmber 5. 1990 Inspection. arent change from <br /> <br />3. Presence <br />part of of water, surface and ground Seep <br />the drainage channel across from age Occurinq <br />the down hill along the lower <br />end of tree cluster. <br /> Tha fln w is flowiR4 into Pond # 004. <br />4. Condition of underdrain (approx. current width, depth, and length), material <br />gradation and characteristic, compaction, presence. of water Not Applicable <br />5. General material movement Minor settlement cracks within the backfilled <br />and graded area above the old highwall. Will be kept under observation <br />and repaired ;f ncroccar~( <br />6. Proximity and treatment of seep points Not Applicable <br />7. Condition of slope fill surface (grading, cracks or sloughing, erosion, <br />revegetation) The ge^~.r137. r^^dLfl^ of tha grariari fill ciirfara is gnnrl_ <br />Good vegetation cover around check dams. No major visible evidence of <br />cracking or settlement except as noted. Light snow cover. <br />8. Reco mmendation Continued observation as the fill is placed and the <br />West Wadge Pit >s gra a an rec acme > ere >.a <br />erosion should be monitored and repaired as necessary. <br />9. Accountability <br />I certify the p~~e~'~ servations and comments to be true and accurate to <br />the best of,Iq~P" `ic~ur~Qd'cfrr~. <br />~ /; ~' ~ <br />~ 9 ~ December 7, 1990 <br />2 Zrl fahrka•.~• Date <br />Col <br />a <br />