Laserfiche WebLink
• • <br />TABLE 2 (Cont.) <br />Summary of Surface Yeter Monitoring Sites <br />for the Nucle Mine <br /> Cessation <br />Site Name Monitoring Frequency <br />(Computer No.) Drainece Tvpe of Flow Measurement end Remarks Flow Duality <br /> <br />SY-N8 Upper South Second Continuous recorder and stilling well coupled with manual N/A N/A <br />(SA0008, SN0008) Perk Irrigation flow measurements (flow = cross section x velocity) <br /> Ditch (Tuttle Drew) <br />SY-N9 Lower South Second Continuous recorder end stilling well coupled with manual N/A N/A <br />(SA0009, SN0009) Park Irrigation flow measurements (flow = cross section x velocity in wooden <br /> Ditch (Tuttle Oraw) flume box) <br />MPDES 00T Mid-Lower Wes[ Continuous recorder with sharp-crested 90° V-no CCh weir 2 2 <br /> <br />(DA0001) Return Ditch <br />MPDES 002 Tributary to Type of flow measurement not determined; no discharge 2 2 <br />(DA0002) Tuttle Drew observed since 7980 <br />MPDES 003 Tributary to Type of flow measurement not determined; no discharge 2 2 _ <br />(DA0003) Tuttle Drew observed since 7980 <br />NPDES 004 Tributary to Type of flow measurement no[ determined; no discharge 2 2 <br />(DA0004) Tuttle Drew observed since T980 <br />NPDES 005 Tributary to Type of flaw measurement not determined; no discharge 2 2 <br />(DA0005) Tuttle Draw observed since 1980 <br />