My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-10-16_REPORT - M1990106
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1990106
>
2006-10-16_REPORT - M1990106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 8:41:41 AM
Creation date
11/27/2007 12:58:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990106
IBM Index Class Name
Report
Doc Date
10/16/2006
Doc Name
Annual Fee/Report/Map
From
RBK Construction, Inc.
To
DRMS
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Notice of Intent to Continue Mining Operatior_s OCT6, <br /> <br />llOc ConsCruction Materials Annual Report 2006 <br />Pe_^.nittee Name:RBK CONSTRUCTION, INC. ~msionofRecfamafionJ <br />Mining and S <br />Pe_-:nit No. M-90-106 afety <br />Operation Name:RBK Pit No. 30 <br />Anniversary Date: October 16 2006 <br />Total: ~ <br />$281.00 <br />1. a. Permitted acreage: 9~.9 b. County where mine is located: Pueblo <br /> <br />2. Has this mine been Granted TE*?PORP~Y CESSATION STATUS? YES NU <br />Does this mine operate MORE' or LESS than 180 days per year? MO ~ Lc SS <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during Cze report year.* <br />5. Total acres reclaimed for the report year; <br />6. Total number of acres in topsoil replacement stage: <br />a. P.verage tickaess of topsoil replaced: <br />7. Total number of acres seeded: <br />a. List species seeded & seed'_ng rate .or report year on tack <br />8. For non-phased opera*_ions provide dates extracc_on ceased: <br />a. Date reclamation began: <br />9. The tyre and approximate avantity or fertilizers, orcaaic material or soil <br />conditioners used for the report year.* <br />10. Estimated total acres ~,o bE,~`=zcted ia.the..next report~ye_-:- <br />11. coMM~:NmG: No change since last pap or annual reporE <br />" Please show t.e location of the acreace for teems ~ - 6 on your -p--. <br />Indicat=_ the DhaseS of the reclamation which have been cpmpleCed, corn=lat-d w=t_. <br />your timetable. For phased operations snow daces e:araction ceased and dal=_s <br />reclamatior_ began. <br />** NOTE: If zeta have no been ar: :antes since the last annual rex_t and you <br />Dr eviOll51V su 'fled a ma which r_e __v depicts the cnrrenC acreage _~ i__~ns 2 <br />trrough 6, ,z n~w_ _ is unn Gass _, However, this must be sated above. <br />., ,,,,1111~J~~~ l1 9 / <br />signature: °" I, / pate: 10 October. 200.6 <br />Please Hype or tint curt=_nt ^ontact name, mailing address, and phone n-amber below: <br />Contact Name: ~n nAa~Nanmpistpr Phone: 719-489-3388 <br /> Fn:~ No: 719-489-2268 _ <br />company: RBK Construction <br />Adaress: P.O. BoX 376 <br /> Rvet CO 81069 <br />Federal Tax ID No. or Social Security No.: <br /> <br />~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.