Laserfiche WebLink
• <br />• iii iiiiiiiiiiiii iii <br />999 <br />Bowie Resources Ltd. <br />Bowie #1 Mine <br />puarterty Waste Disposal Area Inspection Report <br />4th Quarter of 1996 <br />Item <br />YeslNo Comments <br />1 Quantity of waste material added to waste disposal NA No gob was added to the waste diposal pile during <br /> area during reporting period. this reporting period. <br />2 Waste material deposited and compacted in NA No gob was added to the waste diposal pile during <br /> 24 inch lifts? this reporting pedod. <br />3 Drainage alterations constructed? NA No gob was added to the waste diposal pile during <br /> this reporting period. <br />4 Present height of waste material? Highest height appra>omately 99 feet <br />5 New bench constructed? No <br />6 Refuse material outslopes placed at 1 V:2V outslopes? NA No gob was added to the waste diposal pile during <br /> this reporting period. <br />7 Adequate drainage on top of completed fill? NA No gob was added to the waste diposal pile during <br /> this reporting period. <br />8 Bench drainage adequate? Yes No gob was added to the waste diposal pile during <br /> this reporting period. <br />9 Outslopes covered with 4 foot non-toric, NA No gob was added to the waste diposal pile during <br /> noncombustible material? this reporting period. <br />10 germs constructed on outslopes7 Yes <br />11 Evidence of structural defects? No <br />12 Topsoil adequately salvaged and stored? NA No additional topsoil was salvaged during this reporting <br /> period. <br />13 Trash removed? NA No gob was added to the waste diposal pile during <br /> this reporting period. <br />14 Additional comments? No Drainage control was monitored and maintained <br /> throw hoot the 4th quarter of 1996. <br />I certify the above report as being accurate to the best of my knowledge. <br />Signature <br />a -~1- 97 <br />Date <br />ORTGOBJ(LS 1/16/97 <br />