Laserfiche WebLink
Annual Report for the Cooper Fit M 1977-568 <br />2001 <br />Approximately ]6,000 tons of asphalt mix was produced from the pit this year. This material carne from existing <br />stockpiles that have now been depleted. A contract for crushing in this pit is in the process of being awarded. It is <br />hoped that approximately 50,000 tons of material will be crushed and stockpiled for use as aggregate in Hot <br />Bituminous Pavement. It will probably take approximately three years to use all the material at our present rate of <br />consumption. It is expected that new disturbance will amount to less than 1 acre. The area to be mined has been used <br />as a stockpile area in the past and has already suffered significant disturbance. <br />