Laserfiche WebLink
Notice of Intent to Continue Mining Operations <br />112c Construction Materials Annual Report <br />Fermittee Name: ANDESITE ROCK COMPANY <br />Permit No.: M-1988-048 <br />Operations Name: CARR GRAVEL RESOURCE <br />Anniversary Date: September 22, 2004 <br />Total: $688.00 IDue on vour Anniversary Date? <br />1. a. Permitted acreage: 1412 +/- b. County where mine is located: <br />2. Has this mine been granted Temporary Cessation Status? <br />Does this mine operate MORE or LESS than 180 days per year? <br />3. Does this mine have a phased reclamation plan? <br />4. Total acres affected during the report year: <br />a. Total acres affected to date <br />5. Total acres reclaimed for the report year: <br />6. Total number of acres in topsoil replacement stage: <br />a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or <br />soil conditioners used for the report year: <br />WELD <br />bS2 <br />8~S2BE <br />YES N® <br />660 <br />50 <br />50 <br />as per permit <br />n/a <br />n/a <br />10. Estimated total acres to be affected in the next report year: * 50 <br />11. Comments: We continued to mine through the amended permit area and should be done mining it <br />by the end of the 2004 calendar vear. We have already topsoiled 50 acres from last year's mining, and <br />will be seeding those 50 acres this fall. Seeding is per seed mix in permit. Next vear we will get back into <br />the originally permitted acreage and start by mining approximately 40 acres to the north of processing <br />plant - it is an area within Phase 1 of the original mine plan that we did not mine previously If we finish <br />that area next mar we will then continue south of the processing plant (where we had been mining iust <br />previous to mining the amendment acreage Please see the attached map for areas <br />' Please show the location of the acreage for items 4-6 on your map"". Indicate the phases of the reclamation which <br />have been completed, correlated with your timetable. For phased operations, show dates extraction ceased and <br />dates reclamation began. <br />*" NOTE: If there have not been any changes since the last annual report and you previously submitted a map which <br />correctly depicts the current acrea a in items 2 through 6, then a map is unnecessary. Howevegr, this must be stated. <br />Signature: al/t Date: / l <br />Please type or print current co ct name, mailing address, and phone number below: <br />Contact Name: Lynn Mover Phone: 303-287-4656 <br />Company: Andesite Rock Company Fax : 303-289-1348 <br />Address: 7321 East 88~h Avenue Suite 200 Henderson CO 80640 <br />Federal TaxlD: <br />LMlC-DMGAnnRpt2004-091704.doc -sent via Cenified Mail # 7000 0520 0018 6565 6928 <br />