Laserfiche WebLink
RELATIVE COMPACTION TEST RESULTS <br /> 1'It(l,l1:1_"I West Elk PROJECT NO : M89005MT DATE Wednesday 9-27-89 <br /> I.(lc'AI Ir111 Past of Summerset ENGINEERING TECIINICIANDostaler/eelvelle <br /> C I. IFI)'1'WesL Elk <br /> DEPTII PROCTOR OPTIMUM DRY <br /> OR DENSITY MOISTURE DENSITY MOISTURE RELATIVE <br /> Iln . Lrv-A I' I(IN ELEVATION PCF ICCNTENT PCF CONTENT COMPACTION SOIL TYPE <br /> 18 I50' south -f north edge, 200' Top of Gob 88.0 I 16.5 95. 3 3.2 100 Cob <br /> west of east edge pile <br /> 19 10' northeast of test location Top of Gob 88.0 16.5 81.2 3. 5 92 " <br /> A pile <br /> 2U bench 200' of west edge, center Top of Gob 88.0 16.5 95. 9 7. 1 100 <br /> aL bench area pile <br /> 21 3U' southwest of test location Top of Gob 68.0 16. 5 85. 8 15.2 98 " <br /> C on hench pile <br /> I1I:r17\RY.1; : 'Ihc LceL results indicate the density and moisture content for the location and <br /> ,• le"ation tested only . <br /> .;,,e daily field report for this date for additional information . <br /> lambert ana ,-R000eiateo <br />