Laserfiche WebLink
t <br />1 <br />.1 <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br />1 <br />Hydrologic Monitoring Requirements <br />cont'd <br />-3- <br />November 13, 19fl5 <br /> Type of Monitoring* <br />Site Station Monitored Draina a Frepuenc Sample Parameters <br />SW24-1 Red Wash " ** " <br /> Above Pond RP-1 " <br /> Tributar <br />SW31-1 Scullion Gulch " ** " <br /> Above Lincoln " " <br /> Reservoir <br />SW6-1 Grab Sample Fossil Reservoir Monthly ° <br /> Quarterl ° <br />SW33-1 " Raven Park Dam " ° <br /> ° <br />;Data to oe reportea quarterly. <br />**Sample ASAP following significant rainfall events. If samplers contain <br />water, run full suite analysis (Attachment A). If samplers are reached <br />within two hours of rainfall event, take field parameters. Submit all <br />sample results in the quarterly report. If a "no flow" is reported for a <br />given quarter, this must be verified by a crest stage gage height of 0.0' <br />for the entire quarter. <br />A-3 <br /> <br />