Laserfiche WebLink
Wect Elk Coal Company, Inc. <br />Post Otfice Box 591 <br />Somerset. Colo ratlo 81434 <br />Telephone 303 929 5015 <br />September 20, 1989 <br />h ~ ( ~~ <br />1 -- - <br />t. <br />.. ~, <br />r ti '~' <br />III IIIIIIIIIIIIIIII <br />999 <br />;.:,. ~ r; <br />~~. . <br />~^9 <br /> <br />Mr. Matthew S. Hayes <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />Re: Lower Refuse Pile Monitoring Data Report, Permit C- <br />80-007 <br />Dear Matt: <br />West Elk Coal Company, Inc. and our consultant, Schaaf <br />& Associates, have reviewed the survey data of monument <br />#SB3 from the 2nd Quarter refuse pile self-inspection <br />report. It was determined that the stake at this <br />monitoring station was bent and the survey point was <br />changed to ground level (from the tip of the stake). The <br />elevation difference is simply the height of the stake. <br />The next survey of this station should show an accurate <br />change in the outslope, if any. The site was visually <br />inspected and no signs of instability were noted. <br />Please contact me or Dennis Conn should you have any <br />questions. <br />Sincerely, <br />Kathleen G. welt <br />Environmental Engineer <br />KGW:sds <br />xc: J. L. Coffey <br />D. P. Conn <br />S. J. Mowry - CMLRD <br />AMCO b?04 <br />