Laserfiche WebLink
as it leaves the mine area. . <br />• Nbnthly flow, pH, temperature, aril conductiviiy measurements will be taken at the five monitoring <br />locations to assess potential impacts of the mine and to fulfill the requirements for the water <br />augmentation plan. V~fater quality parameters listed in Table 2.04.7-2 will be collected on a quarterly <br />basis for SW-102, and on asemi-annual basis forthe remaining four stations (SW-N104, SV1FN105, <br />SV~N108 and SV~N109). The discharge point at Pond 007 will also be monitored for NPDES <br />requirements. <br />~p~ <br />•` <br />`~ <br />(Revised 4596 <br />• <br />2.04.7-37 <br />~*~... <br />