Laserfiche WebLink
<br />1 <br />' "Ihe anchor trench was filled following completion of the liner installation. The access road around <br />the pond perimeter was graded and a chain link fence was installed. Riprap was placed in the spillway <br />' plunge pool. Final inspection and approval was accepted by Colorado River Engineering on March 27, 2000. <br />' Conclusion <br />The construction of the retention pond was completed to the lines and grades shown on the design <br />' drawings. The embankment and subgrade earthwork were found acceptable, The impermeable IiDPE pond <br />liner has been inspected and was found to be free from defects. [t is our opinion that the storm retention will <br />safely store and retain storm runoff water. <br />' If you have any questions, please do not hesitate to call 970-625-4933. <br /> <br /> <br />' CM:cm <br />Encl: <br />CC: Kvaemer, Ed Hudock <br />' UppcrVond.doc <br /> <br />1 <br />1 <br /> <br />1 <br /> <br />1 <br />Sincerely, <br />C° ~~~ <br />Christopher Manes, P.E. <br />1 <br />