Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />Apri101, 1999 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Subject: Battle Mountain Resources, Inc. -San Luis Project <br />DMG Permit No. M-88-112 <br />Monthly Pond Compliance Report -March 1999 <br />RECEIVED <br />APR 05 1999 <br />O~sion of Af~~rals 8 Geology <br />Dear Mr. Dillie: <br />Attached is th March, 1999 monthly summary of cyanide analysis performed on samples <br />from the tailings pond and the collection pond as required. TR-010 specifies a simple <br />monthly average for regulating pond compliance. The March overages are as follows: <br />Tailings Pond 0.02 ppm CN-wad, 0.40 ppm CN-total. Collection Pond 0.02 ppm CN-wad. <br />0.02 ppm CN-total. <br />Sincerely, <br />/ l 0~~ j <br />Ron Zumwolt <br />Enclosures <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />