My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP50456
DRMS
>
Back File Migration
>
Report
>
REP50456
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:55:26 AM
Creation date
11/27/2007 12:51:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977193
IBM Index Class Name
Report
Doc Date
9/24/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III ~ <br />999 <br />Notice of Intent to Continue Mining Operatic <br />112c Construction Materials Annual Report <br />Permittee Name: Tezak Heavy Equipment Co. Inc. <br />Permit No. M-77-193 <br />Operation Name: T.H.E. Aggregate Source <br />Anniversary Date: November 22, 1998 <br />Total: $550.00 (Due on your Anniversary Date) <br />R~ '' e~° ~ <br />RECEIVED <br />- ~9 <br />DIV. OF MINERALS <br />& GEOLOGY <br />1. a. Permitted acreage: 100 <br /> b. County where mine is located: Fremont <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br /> Does this mine operate MORE or LESS than 180 days per year? MORE LESS <br />3. Does this mine have a phased reclamation plan? ~ YES NO <br />4. Total acres affected duriny the report year:• _n_ <br />5. Total acres reclaimed for the report year:* -D- <br />6. Total number of acres in topsoil replacement stage: -0- <br /> a. Average thickness of topsoil replaced: -0_ <br />7. Total number of acres seeded: -0- <br /> a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: N/A <br /> a. Date reclamation began: N/A <br />9. The type and approximate quantity of fertilizers, organic material ~r soil <br /> conditioners used for the report year:* -0- <br />10. Estimated total acres to be affected in the next report year:* = 0- <br />11. CONA7ENT5: We are mining an existing bench and not <br /> disturbing any more acreage this year. <br /> <br /> Please show the location of the acreage for items 4 - 6 on your map ~+. Indicate <br />the phases of the reclamation which have been completed, correlated with your timetable. <br />For phased operations show dates extraction ceased and dates reclamation be<(an. <br />+* NOTE: If there have not been any changes since the last annual report and you <br />pre viously submitted a map which correctly depicts the current acreage in items 2 through <br />6, then a new map is unnecessary. However, this must be stated above. <br />Signature: ~_ ~ ~ ~~ Date: 9-24-9A <br />~\ <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: Ed Tezak. Jr. Phone: (719 ) 275-6746 <br />company: T.H.E. Aggregate Source FAx No: 1719 ) 275-8196 <br />Address: 201 Tunnel201 Tunnel Drives <br />Canon City, CO 81212 <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.