= go m m � m w no r m m m m m m M " M �
<br /> §60.2 44 CFR Ch. 1 (10-1-90 Edition) Federal Emergency Management Agency §60.3
<br /> erosion-prone communities. Any corn. (c) A flood related crorlon-prone ' Administrator has not provided suffl- the effects of buoyancy, (if) be con-
<br /> munity may exceed the minimum cri. community applying for flood Insur- cient data to furnish a basis for these strutted with materials resistant to
<br /> teria under this part by adopting more ante eligibility shall meet Elie stand- regulations In a particular community, flood damage, (III) be constructed by
<br /> comprehensive flood plain manage- ards of I60.5(a) to become eligible. Elie commuuity shall obtain, review methods and practices that minimize
<br /> Inent regulations utilizing the stand- Thereafter, the community will be and reasonably utilize data available flood damages, and (Iv) be constructed
<br /> ards such as contained In Subpart C of given a period of six months from Use from other Federal. State or other with electrical. heating, ventilation,
<br /> this part. in some instances, commuul- date Elie (loud-related erosion areas sources pending receipt of data from plumbing, and air conditioning equlp-
<br /> ty officials may have access to Infer. having special cruslon hazards are de- the. Administrator. However, when met L slid other service facilities that
<br /> maLlon or knowledge of conditions llneated In which to meet the require. special flood hazard area designations are designed and/or located so as to
<br /> that require, particularly for human meats of § 60.5(b). and water surface elevations have prevent water from entering or accu-
<br /> safety, higher standards than tine 111111- (d) Communities Identified In Part been furnished by Elie Administrator, mulathtg within Elie components
<br /> Imam criteria set forth In Subpart A 65 of this subchapter as containing I hey shall apply.The symbols defining during condlLlons of flooding.
<br /> of this part. 'Therefore, any flood plain more than one type of hazard (e.g., such special flood hazard designations (4) Review subdivision proposals and
<br /> management regulations adopted by a any combination of special flood, are set forth In §64.3 of this suhchap- other proposed new development. In-
<br /> State or a community which are more mudslide U.e, mudflow), and flood-re- Ler. In all cases the mhdmum require- eluding manufactured home parks or
<br /> restrictive than the criteria set forth lated erosion hazard areas) shall adopt ments governing Elie adequacy of the subdivisions, to determine whether
<br /> In this part are encouraged and shall flood plain management regulations flood plain management regulations such proposals will be reasonably safe
<br /> lake precedence, for each type of hazard consistent for flood prone areas adopt�d by a fron (loodlug. I( a subdivision propos-
<br /> (41 FR 46975.Oct. 26. 1976. Redesignaled at with the requirements of 11 60.3, 60.4 particular community depend on the al or other proposed new development
<br /> 44 FR 31177, May 31. 1979, and amended at slid 60.5. amolnit of technical data formally Is In a flood prune area, any such pro-
<br /> 48 FR 44552, Sept. 29. 1983; 49 Fit 4751, (e) Local flood plaint nanagement provided to Lhc community by the Ad- posals shall be reviewed to assure that
<br /> Feb.8, 19841 regulations cony be submitted to Elie rnlnistraLor. Minimum standards for (1) all such proposals arc consistent
<br /> Slate Coordinating Agency designated communities are as follows: with the need to minimize flood
<br /> 160.2 Minimum compliance with Rood pursuant to 1 60.25 for Its advice and (a) When the AJudnlstrator Itas Pot damage within Elie flood prone area,
<br /> plain management criteria. concurrence. The submission to Elie I defined the special flood hazard arras (II) all public utilities and facilities.
<br /> Slate shall clearly describe proposed withlu a community, has not provided such m sewer, gas, electrical, and
<br /> Ing(a) r flood-prone community appall enforcement Procedures. water surface elevation data, and has water systems are located and con.
<br /> me for flood standards
<br /> f .3( shall (f) The conununfty official responsi- not provided suffielent data to identify sl.rucLed to minimize or eliminate
<br /> ordmeet the standards of § 80.3( II In Elie floodway or coastal high hazard flood damage, slid (III) adequate dr¢In-
<br /> has n to become eligible the
<br /> If n FIIRM plc for sub he Aditilig annual or pursuant
<br /> lies not been Issued for Lhe community reports Lm the Adnlnith this
<br /> pursuant area. but the of such
<br /> has by sub- age Is Provided to reduce exposure to
<br /> at Elie time of application. Thereafter, to 4 59.22(b)(2) of lids subchapter I presence of such hazards by sub- flood halpilre
<br /> the community will be given a period shot] also submit copies of each annual milling an aVPllcut.lmn to participate (5) Requlrc within flood prone areas
<br /> or blennlal report to any State Coordl- I In the Program, the community shall: new and replacement water supply
<br /> of six mouths from the date the Ad uaLing Agency. (1) Requlrc permits for all proposed systems to be designed to minimize or
<br /> minlslrator provides the data set forth (g) A community shall a5811rC Unlit construction or other development In rl0nlnate Infiltration of flood waters
<br /> In § 60.3 (b), (c), (d), or (e) In which to the community, Including the place- Into Elie systems; and
<br /> meet the requirements of file apPllca- Its comprehensive plan Is consistent menu of manufactured homes, so that (6) Requtre within flood-prone areas
<br /> ble paragraph. If a community has re- with the flood plain management ob- it may detomdue whether such con. (1) new still replacement sanitary
<br /> celved a FIIBM, but has not yet ap- 1ectives of this Part. stroctlon or other development Is pro sewage systems to be designed to minl
<br /> piled for Program eligibility, Elie com- (11) The comununity shall adopt and posed within flood prone areas; maze. or clhnlnate Infiltration of flood
<br /> inunity shall apply for eligibility di- enforce flood plain management rcgu. (2) Review Proposed development to waters Into the systems still discharges
<br /> rectly under the standards set forth Ili lotions based on data provided by Elie I assure that all necessary permits have frown the systems IPto flood waters
<br /> § 60.3(b). Thereafter, the community Administrator. Without Prior approval Ices rccrit rd Iron tlmse goveinnle.n and (11) unsite waste disposal systems
<br /> will be given a period of six months of Elie Administrator, Elie conununlLy I Lai agencies from which approval Is re- to br located to avoid Impalrineut to
<br /> from the date the Administrator pro- still]) not, adopt and enforce flood plain quired by Federal or State law, Inclld them or contamination from them
<br /> vldes the data set forth tin 160.3 (c), management regulations based upon lug secllon 404 of the Pedeml Water during flooding.
<br /> (d), or (e) In which to meet the re- Modified (into rellectiog natural or Pollution ConLrol Act Amendments of (b) When the Administrator has des.
<br /> quirements of the applicable Para- roam made physical changes 1972, 33 U.S.C. 1334; b;nnled areas of special flood hazards
<br /> graph. 14L FR 46975,Oct. 26, 1976. Redesignated at (3) Rctlew all permit applications to (A zones) by Elie publication of a corn.
<br /> (b) A mudsllde (i.e., mucillow)-prone 44 FR 31177, May 31, 1999, and amended at determine whether proposed building mnudty's P'1I11M or FIRM. but has nel.
<br /> community applying for flood Insur- 48 FR 29318, June 24, 1983; 48 Fit 44552, fines will be reasonably safe from Lher produced water sut'f6ee elevation
<br /> ance eligibility shall meet Elie stand- Sept. 29. 1983; 40 PU 4751. Feb. a, 1984; 50 flooding. If a proposed bullding site Is data Ilor Identified a floodway or
<br /> ards of §60.4(a) to become eligible. Fit 36024.Sept. 4. 1085E In a flood prone area, all new cousLr tic- coastal high hazard area, the commit-
<br /> Thereafter, the community will be Lion and substantial ImpruvennciiLs nity shall:
<br /> A 60.fl Pl flood
<br /> plain management crllerin
<br /> given a Period of six months from U1c for Rand�prnne arena. shall 111 be Jeslguetl fur uuulillcd) ;and (U Requlrc Vennits for all proposed
<br /> date the mudslide (i.e.. mudflow) areas adenpalelY anchored to prevent Ilnla com;tructlnn and other de.velnpnlenls
<br /> having special mudslide hazards are The Administrator will provide Elie Lion, collapse, or Interal uuwcuvhnl of Including the placement of mauufac
<br /> delineated In which to meet the re- daln upon which flood plabl nonage- Lit(- strucl.um tcsulling frog hydhudy- Loved homes, w11hln "Lune. A oil the
<br /> quirements of §00.4(b). ment regulations shall be based. If Lhe namic and hydrosiallc. Iliad:;. Ili(holing rnnmm III.y's PIIIIM or PIUM:
<br />
|