<br />ANNLiAL REPORT
<br />INSTRUCTIONS
<br />
<br />.~ccoratng tc C.R.S. 31-33-11ti(i).
<br />the operator shall submit a repon z
<br />reclamation accomplished to date
<br />durine the upcoming year, and reel
<br />a report and map to enclosed annw
<br />the above elements ma}' suff-ice for
<br />If your operation is subject to the
<br />pravid~e with [he Annual Report t
<br />1.13.71. I)(a):
<br />(i) the condition of [he
<br />(ii) what specific me
<br />standards and Environmental
<br />and _.::.~.. --_ _.~- i i ~~: ~~,:,, on the anmve; s..n date of the pcrtnit each year,
<br />td a map showing the extent of current disturbances to affected land,
<br />nd during the preceding year, new disturbances that are anticipated to occur
<br />rmation that wilt be performed during the upcoming year. Please attach such
<br />I report form. (An adequately labeled map that clearly delineates and includes
<br />a written repon.)
<br />avisions of Temporary Cessation as defined in the Act and Rules, you must
<br />following information as required by 2 CCR 407-], 407-4, and Rules
<br />at [he time of cessation;
<br />been and will be implemented to comply with reclamation, performance
<br />Plan requirements, if they are part of your approved application; and
<br />(iii) plans for resumption of) mining operations.
<br />Please provide the additional following information with your Annual Report, as applicable:
<br />(a) Per [he requirements of 2 CCR 407-1, 407-4, and Rules 1.150), provide an updated statement
<br />--'regarding the'sufftciency of the value of [he Finarrcial Warranty, specifically:- -'- - -- - --' -
<br />(i) Per the require[ ents of 2 CCR 407-1, 407-4, and Rules 1.15(1)(a), provide an updated
<br />statement regarding the sufficiency of the value of the financial warranty. Specifically,
<br />irrevocable letters o credit, Deeds of Trust, and security agreements, self-insurance,,salvage
<br />credit, and first prix '[y liens on project related fixtures.
<br />(ii) Per the require ents of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), permits secured with a
<br />Deed of Trust or a . ecurity Agreement, the operator shall submit an update, by a qualified
<br />independent apprais r, indicating any changes in property value, and a statement summarizing
<br />- -any circumstances hich may affect the adequacy of the Deed of Trust, or Security agreement,. _ _ _ _ _
<br />and the value of the raperty subject to either of [Itese instruments. The report shall also provide
<br />proof that there are t~o past-due property taxes.
<br />(i) Per the requiren ents of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an
<br />Irrevocable Letter o Credit, the operator shall have the bank provide documentation in the form
<br />of a balance sheet, c rtified by a Certified Public Accountant, demonstrating that the Letter of
<br />Credit does not exce d ten percent (10%) of the bank's capital surplus accounts.
<br />(ii) Per the requirem nts of 2 CCR 407-i, 407-4, and Rules 49.3(c), permits secured by a First
<br />Priority Lien on any txtures and Equipment, the operator shall provide a report in sufficient
<br />detail to fully descril e the condition, value, and location of all pledged fixtures and equipment.
<br />Ib) Per the requirements of 2 CCR 407-I, 407-4, and Rules I.15(I)(c), all monitoring information
<br />required as part of the appro ed permit application, to include the Environmental Protection Plan. (Please
<br />[rote that if you are not a Des snared Mining Operation, you will not have an Environmental Protection
<br />Plan as part of your approve[ permit.)
<br />
|