My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP50186
DRMS
>
Back File Migration
>
Report
>
REP50186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:55:16 AM
Creation date
11/27/2007 12:46:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Report
Doc Date
3/14/1985
Doc Name
BLUE RIBBON COAL MINE - QUARTERLY CERTIFICATION OF BENCH RECONSTRUCTION PROJECT
From
MLRD
To
SUSAN MOWRY
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF NATURAL RESOURCES <br />Davitl H. Getches, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />Richartl D. Lamm <br />Governor <br />DATE: March 14, 1985 <br />T0: Susan Mowry <br />FROM: Jim Pendleton - <br />RE: Blue Ribbo Coal Mi - Quarterly Certification of Bench Reconstruction <br />Project <br />Pursuant to your request, I have reviewed the certification report prepared by <br />Larry M. Reschke, Colorado Registered P.E. No. 19891. Mr. Reschke's report <br />covers the bench reconstruction activity at the Blue Ribbon Mine site from <br />September 24, 1984 through January 31, 1985. As of January 31, 1985, Mr. <br />Reschke reports that partial completion of the work has included the <br />excavation of the toe area, the recompaction of colluvium in the toe area <br />under the coal waste, the installation of the draw north of the bench, and the <br />installation of select material in the toe area. Mr. Reschke also observes <br />• that these portions of the work have been done in proper workmanship manner <br />and according to the plan approved by the Colorado Mined Land Reclamation <br />Division. As of January 31, 1985 Mr. Reschke also observed that the following <br />portions of the work remain to be completed: Stripping and clearing of minor <br />areas, completion of the drainage structures on the No. 1 pond, placement of <br />colluvium as cover and at each end of the reconstructed bench, installation of <br />additional underdrains, placement of additional underground development coal <br />waste, and final reclamation of the site. <br />Mr. Reschke has done an acceptable job of documenting the work performed to <br />date. The moisture/density testing performed appears to be adequate to insure <br />proper compaction of the earth materials. The design engineering firm, Rocky <br />Mountain Geotechnical of Colorado Springs, has preformed contract inspections <br />to assist Mr. Reschke with several minor design modifications. The work to <br />date appears to be preceding acceptably towards completion of the bench <br />reconstruction, in compliance with the approved plans. Therefore, I recommend <br />acceptance of Mr. Reschke's certification report. <br />/ph <br />cc: Bob Liddle <br />Doc. No. 8514 <br /> <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />iii iiiiiiiiiiiu iii <br />999 <br />