Laserfiche WebLink
<br /> <br />~t <br />Reclamation Costs ($ thousands) <br />Henderson Mine <br />March 1987 <br />Page 6 <br />20. Seepwater Canal/Pumphouse (52 acres) <br />a) Dismantle, breakeven $ 0 <br />b) Grading and site preparation 2 <br />c) Reveg. road, etc., eight acres at <br />$1,0451acre 8 <br />d) Fert. 41 acres, one application 1 <br />e) Buffer, three acres 0 <br />Total $ 11 <br />21. Topsoil Stockpiles/Roads (190 acres) <br />a) Reveg. 44 acres at $1,045/acre $ 46 <br />b) Buffer, 146 acres 0 <br />Total $ 46 <br />22. Spotted Doe Area (24 acres) <br />a) Buffer 24 acres $ 0 <br />Total $ 0 <br />23. Lost Creek Reservoir Shores (588 acres) <br />a) Perm use, road, five acres <br />b) Reveg. 20 acres at $1,045/acre <br />c) Fert., 95 acres, one appl. <br />d) Buffer, 468 acres <br />Total <br />GRAND TOTAL <br />$ 0 <br />21 <br />0 <br />0 <br />$ 21 <br />$4,412 ($ thousands) <br /> <br />