My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP50148
DRMS
>
Back File Migration
>
Report
>
REP50148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:55:14 AM
Creation date
11/27/2007 12:45:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987013
IBM Index Class Name
Report
Doc Date
5/31/1994
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110 2 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ <br />r' <br />~, _ • III IIIIIIIIIIIII III` i <br />RErEIVEp <br />Notice of Intent to Continue Mining Operations <br />110(2) Annual Report MAY 31 1994 <br />Permittee Name: Southway Construction Company Ci;•;~!cr~ cr <br />Permi t No: M-87-013 ~ ~~~ uc~;~R, <br />Operation Name: Burton Pit' ~,nF,~ y <br />Anniversary Date: 05/06/94 v II~ <br />Total: $225.00 (Due on your Anniversary Date) <br />1. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does this mine operate MORE or LESS than 180 days per year? MORE ESS ~ <br />/~,7~~0~~ $ 44 <br />2a. Financial Warranty: S a°'~- 2b. Permitted acreage: -~ <br />3. Does this mine have a phased reclamation plan? YES LNDJ <br />4. Total acres affected during the report year:' ~- <br />5. Total acres reclaimed for the report year:* ~- d <br />6. Total acres in various stages of reclamation:` <br />a. Backfilled: d. Topsoil replaced: <br />b. Graded: ~ = Average topsoil thickness <br />c. Seeded: replaced: <br />List species seeded & seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* <br />8. Estimated total acres to be affected in the next report <br />9. COMMENTS: <br />6 <br />r:' C~. ~- <br />i <br />pr /G G~R.~as <br />* Please show the location of the acreage for items 4 - 6 on your map*'. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />** NDIE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: ~~~~~-^-yr~"~ Date: .J ~5~~~~ <br />Please type or rint current contac`t~rlame, mailing address, <br />Federal Tax ID No. or Social Security No.: o ~ - ~~ ~3 ~'Z z <br />Contact Name: ~Ok{kt l l~lc9G~~~~77~ Phone <br />Company: lJpu°k~cu~~A ~p~eS%,Puc`~~owCc2 <br />Address: ~ ~7 2~-`6G i~u~ Qr_ <br />/Q-/~ ~ o s ~- 8~io/ <br />and phone number below:/~ <br />(7/p > 5~9-Sig-~ <br />a~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.