Laserfiche WebLink
<br />Richard Mills <br />Page Z <br />September 12, 1997 <br />8/26 3.8 .3 4.1 1.0 <br />9/10 .76 .4 1.16 .79 <br />9/23 .42 .45 .87 1.35 <br />From March until July, the sum of the flow values for Site 700 and Site 900 correlates perfectly <br />with [he flow value at Site 29. Afrer that point in time, the relationship is moderately accurate to' <br />poor. Why aze the values during the first half of [he year so consistent, yet the second half of the <br />year so erratic? <br />3. The TDS in the Wadge well 008-79-6 is now approximately 1150 mg/I. This compares <br />to a baseline value of approximately 800 mg/1. This is likely as a result of down gradient <br />migration of spoil water from the Mine No. 3 pit [o the east. <br />Please respond to the above questions or comments within 30 days of receipt of this letter. If you <br />have any questions, please call me. <br />Sincerely <br />Kent orham <br />Environmental Protection Specialist <br />cc: Dan Hernandez, DMG <br />CcPv <br />