Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Ptoject <br />CMLRB Permit No. M-88-112 <br />May 2004 Monthly Report <br />Page 3 <br />Table 2 -May 2004 Tailing Disposal Area Piezometer Depth to Water Measurements <br />Piezometer Date Depth to Water <br />feet Total Depth (fr) Volume of <br />Water fr <br />Pll 5/27/04 41.25 41.80 0.55 <br />P12 5/27/04 41.64 41.71 0.07 <br />P13 5/27/04 40.99 41.34 0.35 <br />P14 5/27/04 D 41.24 0.00 <br />PIS 5/27/04 41.10 0.00 <br />During May 2004, water treatment plant sludge was removed from ponds 2 and 3 on May 13'" <br />through May I S'". A sludge material quantity will not be known until the material has been dried <br />and transferred to the tailing facility. This is expected to be completed during July or August. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0799 or Mr. Bill Lyle (303) 324-2630 or (970) 325-4482. <br />S~ cerely, "_ T <br />ulio F. Madrid <br />Environmental Coordinator III <br />Cc: Bill Lyle <br />file <br />