Laserfiche WebLink
BATTLE MOUNTAIN RESOURCES, INC. <br />June 7, 2004 <br />Mr. Jim Dillie <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver. CO 80203 <br />REC~:t,: :.~ <br />JUN 10 2004 <br />OiYlsion of Minerals & Geology <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />May 2004 Monthly Repoli <br />Deaz Mr. Dillies <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of May 2004. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) Plan. <br />Vacuum on the tailing lysimeters was verified on May 27th, no water was present for sampling <br />and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment~iezometers on <br />May 27~, and the West Pit and tailings embankment monitoring wells on May 27 . The May 27`" <br />tailing impoundment piezometer measurements identified these installations were either dry or <br />contained less than 12 inches of water as illustrated in Table 2. Tables 1 and 2 below identify the <br />depth to water measurements collected for each of the site monitoring wells, piezometers and <br />lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on May <br />26th. The May tailings pond underdrain flow average was 40.13 gpm and a total of 430 gallons of <br />water was excavated from the leak detection system yielding a monthly average of 14.82 gpad. <br />During May, the West Pit water treatment plant operated efficiently discharging a total of <br />8,958,800 gallons (27.50 acre-feet) of water to Rito Seco Creek and a total of ],036,900 gallons <br />(3.18 acre-feet) of water was transferted from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. The monthly <br />precipitation accumulation for May was 0.44 inches, with the largest accumulation occurring on <br />May 1~` (0,44"). <br />P.O. Box 310 San Luis, Colorado 8 1 1 52-03 10 (719) 379-0798 Fax (719) 379-0713 <br />