Laserfiche WebLink
Ric hartl D Lamm <br />Governor <br />3 March 1982 <br /> <br />DEPARTMENT OF NATURAL RESOURCES <br />D Monle Pascoe. E.ec ulive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON Director <br />~I~ II~II~~I~II~~I~~ <br />TO: Mike Savage 1\ <br />FROM: Jim Pendleton \~~~~,,,,~(~Y_{~~~-. <br />RE: Quarterly Insp ti on eport for the "East Dump" at the Bourg Mine <br />I have reviewed the quarterly inspection report submitted by Flatiron <br />Company regarding the construction of the "East Dump" overburden spoil pile <br />at the Bourg Coal Mine near Walden, Colorado. In the future, following <br />onset of material placement in the "East Dump", the inspection reports <br />should specifically discuss the degree of compaction being achieved, the <br />stability of resulting embankment slopes, and conformance of the construction <br />with the approved plans. Our major concern is verification that the facility <br />is being constructed as designed. <br />cc: Fred Banta <br />Dave Shelton <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />