.~_
<br />ANNUAL REPORT' ' !~~
<br />INSTRUCTIONS ~~. ,
<br />L ~
<br />~.
<br />~,
<br />Accordine to C.R.S. 34-33-I 16(3), and C.R.S. 34-33.5-I 16(3)(x), on the anniversary date of the permit each year.
<br />the operator shall submit a report and a map showing the extent of current disturbances to affected land.
<br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipated to occur
<br />during the upcomin ~ year, and reclamation [hat will be performed durine the upcoming year. Please attach such
<br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes
<br />the above elements may suffice for a written report.)
<br />If your operation is aubject to the provisions of Temporary Cessation as defined in the Act and Rules. you must
<br />provide with the Annual Report the following information as required by 2 CCR 407-I, 407-4, and Rules
<br />1.13.7(1)(x):
<br />(i) the condition of the operation at the time of cessation;
<br />(ii) what specific measures have been and will be implemented to comply with reclamation, performance
<br />standards and Environmental Protection Plan requirements, if they are part of your approved application: and
<br />(iii) plans for resumption of mining operations.
<br />Please provide the additional following information with your Annual Report, as applicable:
<br />(a) Per the requirements of 2 CCR 407-I, 407-4, and Rules 1.15(1), provide an updated statement
<br />regarding the sufficiency of the value of the Financial Wamnty, specifically:
<br />(i) Per the requirements of 2 CCR 407-I, 407-4, and Rules 1.15(1)(x), provide an updated
<br />statement regarding the sufficiency of the value of the financial warranty. Specifically,
<br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvaee
<br />credit, and first priority liens on project related fixtures.
<br />(ii) Per the requirements of 2 CCR 407-1.407-4, and Rules 1.15(1)(b), permits secured with a
<br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified
<br />independent appraiser, indicating any changes in property value, and a statement summarizing
<br />any circumstances which may affect the adequacy of the Deed of Tmst, or Security agreement,
<br />- and-the value-of-the property-subject to either of these instruments. The report shall alto provide
<br />proof that there are no past-due property taxes.
<br />(i) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.7(3), permits secured with an
<br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form
<br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of
<br />Credit does not exceed ten percent (IOclc) of the bank's capital surplus accounts.
<br />(ii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.9.3(c), permits secured by a First
<br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient
<br />det<ul to fully describe the condition, value, and location of all pledged fixtures and equipment.
<br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all monitoring information
<br />required as Dart of [he approved permit application, to include the Environmental Protection Plan. (Please
<br />note that if ~~ou are not a Designated Mining Operation, you will not have an Environmental Protection
<br />Plan as pan of your approved permit.)
<br />
|