My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP50000
DRMS
>
Back File Migration
>
Report
>
REP50000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:55:07 AM
Creation date
11/27/2007 12:43:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
2/2/1996
Doc Name
BOWIE RESOURCES LTD BOWIE 1 MINE PN C-81-038 4TH QTR 1995 REPORTS
From
BOWIE RESOURCES LTD
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Bowie Resources Limited <br />Bowe #1 Mine <br />Quarterly Waste Disposal Area Inspection Report <br />firth Quarter - 1995 <br /> <br />Item Y/N Comments I <br />1. Quantity of waste material added [o No waste material has been added to the waste <br />waste disposal area this quarter? r{ disposal pile this quarter. <br />2. Waste material deposited and No waste matenal has been added to the waste <br />compacted in 2a' lifts? N disposal pile this quarter <br />3. Drainage alterations constructed? No drainage alterations were constructed during the ~ <br />j NA quarter. The existing drainage pattern was maintained i <br /> around the perimeter of the pile to protect outslopes <br /> and direct drainage at the toe of the pile. <br />I <br />4. Present height of waste material? Highest height approximately 99.0 feet. <br />S. New bench conwctetl? i <br /> N , <br />6. Reluse matenal outslopes placed at No waste matenal has been added [o the waste <br />1 V:2H outslopes? NA disposal pile this quarter. <br />7. Adequate drainage on top of completed No waste matenal has been added to the waste <br />fill? ~ NA disposal pile this quarter. i <br />i <br />8. Bench drainage adequate? Bench drainage was maintained throughout the quarter.y <br /> <br />i Y See Item 3. <br />9. Outslopes covered with 4' non-toxic, No waste material has been added to the waste <br />i non-combustible material? NA disposal pile this quarter. <br />I <br />j 70. Berms constructed on outslopes? j <br />I I v ', <br />11. Evidence of strucairal defects? <br /> N ; <br />I <br />12. Topsoil adequately salvaged and No additional topsoil was salvaged from this pde <br />I <br />~ stored? NA this quarter. <br /> <br />13. Trash removed? I No waste material has been added to the waste <br /> <br />I NA disposal pile this quarter. <br />I t4. Additional comments? Drainage control was monitored and maintained <br /> N throughout the firth quarter of 1995. it <br />I certrfy the above report as being accurate to the best of my knowledge. <br />~_~T ,..,ti.~. ,° <br />Signature <br />/ 30 -4lv <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.