Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />September 2002 Monthly Report <br />Page 2 <br />tailing impoundment during the month, and seepage along Rito Seco Creek remained dry <br />throughout the month. <br />As communicated last month, calendaz year 2002 reclamation activities were initiated on <br />August 29`". Earthmoving activities continued throughout September along (1) the main <br />haulage roadway between Rito Seco road and the BMR parking ditch, (2) the parking <br />ditch, (3) the South Waste Rock Facility and (4) the tank farm. Reclamation activities <br />included: <br />(a) hydrocazbon testing of soils within the tank farm area, excavation of soils above the <br />tank farm geomembrane liner surface, and transport of these soils to the tailing <br />disposal area for remediation, geomembrane liner removal and partial topography <br />leveling of the site; <br />(b) ripping, contouring and topsoiling of the main haulage roadway area; <br />(c) ripping, contouring and topsoiling of the pazking ditch azea; <br />(d} contouring and topsoiling of the South Waste Rock Facility east slope area; and <br />(e) roadway reclamation of the ancillary roadway surface north of the South Waste Rock <br />Facility between the main haulage roadway and the air quality monitoring station. <br />These earthmoving activities should be completed prior to the end of October and <br />seeding of topsoiled areas will be completed shortly thereafter. All reclamation activities <br />completed during the 2002 calendar year will be presented in the 2002 annual report. <br />Finalization of the property transfer associated with Rocky Mountain Farms production <br />well 8324 and the adjoining irrigation circle was completed with Mr. David Faucette <br />during the month of September. The property purchase and transfer to BMR ownership <br />secures BMR a continuously available source of augmentation water to replace water <br />losses associated with the water treatment plant, the tailing facility and other water <br />impoundments. <br />Table 1- September 2002 Depth to Water Measurements <br />Monitorin Site Date De th to Water feet <br />M-1 9/26/02 74.32 <br />M-10 9/26/02 25.87 <br />M-11 9/26/02 38.22 <br />M-11R 9/26/02 45.47 <br />M-16 9/26/02 22.81 <br />M-17 9/26/02 33.04 <br />M-18 9/26/02 27.24 <br />