Laserfiche WebLink
12102 '99 13:41 [D:POWDERHORN COAL FAX:970-464-7181 PAGE <br />WESTERN REVIEW OF CONSTRUCTION <br />COLORADO <br />TESTING, <br />INC. Job No.• 800899 <br />Client: Pte, sMom Coal Comoanv Report No.: 8 Date: J t- a1 99 <br />ProJsd: Waste Coal Piles Report By: W. Ha(av Date; 77-td-9a <br />Prima Contractor. Powdarhom Coal Comnenv Superintendent: Chuck <br />Subcontractor. Superinbndent: <br />Work In propross andlor CompMted elna last roport: Thaeontroctor has elaee~ an aeoroximab 2¢" IIR of waste coal on <br />Qlle N1. Materiel hss bean wheel rolled wRh 1a wheel end domes and a water WCk. MetSda has also been mo-eturo <br />condhlonad. <br />Unexpected sib conditions: WA <br />8amplinp andlor testing performed: Waste coat was tegjsd for co oactlon and molsturo values. <br />CoMormencs of mabrlale, operatlone andlor bat results to project roqulremanb: Ta~„s28 did not meet orolect <br />ronuiromanta for molaturo. Denskv mat orolect roautramenb on testa taken this dajq. <br />PerooNperaona notgled of nonconfomla11C0 to project raqulrorttents: Chuck lPQwderhom Coel Comoanvl. <br />Nonconformance corrected: No. <br />Instroctbne or InfomtaUon roealved(from):~(A <br />Weallter Clesr. wlndv end cool <br />Tachnielans time on protect today: hfluro No, of vklb today: <br />Time end date of next visit: WIII call Reviewed by: <br />AYe'IehWlOpBA 118 <br />