Laserfiche WebLink
<br /> <br />The mine in its entirety was reclaimed in the fall of 1989, <br />with the exception of the sediment control system. All seeding <br />was finished by November 1989, except the pond embankments <br />which were done in 1991. The total acreage topsoiled and <br />seeded is approximately 58.5 acres. TR-11 which was submitted <br />in October 1991, proves by sed-cad analysis that the sediment <br />system is no longer needed, the vegetation on the reclaimed <br />area is substantial enough to handle any precipitation events <br />expected at the site. Upon approval by the division we will <br />remove the sediment system in its entirety, also eliminating <br />the subsoil and topsoil stockpiles that remain. <br />Sincerely <br />`.~ <br />Michael T. Began <br />Project Manager <br />Enclosure <br />cc: Mr. Gerald Fawcett, Kaiser Steel Resources <br />Mr. Jerry Koblitz, Greystone <br />County Planner, Huerfano county Court House <br />2 <br />