Laserfiche WebLink
ANNUAL REPORT <br />Operator: United Companies of Mesa County <br />Operation: Berry Pit <br />File Number: M-1977-132 <br />Anniversary Date: January 13, 2004 <br />The Berry Pit was active this year. Our crusher made a one time visit to the pit and <br />crushed approximately 76,000 tons of material. We crushed mostly asphalt plant <br />aggregates plus.a small amount of 1".roadbase. Our asphalt plant set up in the pit one - -- <br />time during the year and produced approximately 36,000 tons of hot bituminous <br />pavement. A small amount of plant mix aggregates was hauled from the pit to a plant site <br />in Rangely. The pit continues to be used as a storage location for gravel products. <br />United Companies started mining the far west end of our new lease azea when the crusher <br />was on site. This mining area is shown on the map. Locations of existing stockpiles aze <br />shown on the map as well. <br />The weed situation seems to be in better shape this yeaz, probably due to the dry <br />conditions. We will take a look this coming spring and determine if weed spraying is <br />necessary. <br /> <br />