My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP49517
DRMS
>
Back File Migration
>
Report
>
REP49517
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:53:28 AM
Creation date
11/27/2007 12:36:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997086
IBM Index Class Name
Report
Doc Date
3/18/2002
Doc Name
2002 Annual Report
From
Siloam Stone Inc.
To
DMG
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ o ~ ~ ~o~~ ~ ~o~~ <br />(719) 275-4275 • 1360 Rudd Avenue • Canon City, CO 81212 <br />March 13, 2002 <br />RECEIVE® <br />Mr. Jim stevens MAR 1 8 2002 <br />Division of Minerals and Geology <br />1313 Sherman Street Suite 215 DiyisionofMineralsandGeology <br />Denver, Colorado 80203-2273 <br />Dear Mr. Stevens: <br />Re: Annual Report, Annual Date 3/16/00 <br />Bedrock Mine #1, MLR No. M-97-086, <br />FSDSRAL TAX IDS <br />The current bond amount is $21,400, the permitted area is <br />329.69 acres t and the pit has two mining phases. This pit HAS NOT <br />been granted a Temporary Cessation and it HAS operated more than <br />180 days this year. There has been no mining within 200 feet of <br />the Peck Creek tributary canyon as required. The Annual Report map <br />is an excerpt from the application map showing the Southeast por- <br />tion of the mine. <br />We will deal specifically with each of the Annual Report <br />questions as required in Rule 1.15 of the Rules and Regulations and <br />the Annual Notice Letter. <br />(1) We continued to mine on the 4 field stone areas disturbed in <br />past years. These area disturb less than 5.0 acres as allowed <br />in the permit. We have expanded the slab stone mining area so <br />it now covers approximately 3.19 acres near the Pinon Mine in <br />Stage 1. We have been stockpiling finer material in three <br />areas for hand sorting and processing. The grizzlies have <br />been setup on the east side of the mine for processing. The <br />following table shows the status of the area, in acres, dis- <br />turbed at the mine: <br />AISTliRBANCE:!. <br />Field stone reclaimed (STAGE #; <br />0.85 STAGE2 <br />0 TUTALS <br />0.85 <br />Slab stone mining (blue) 3.98 0 3.98 <br />Active field stone mining (pink) 0.75 0.27 1.02 <br />Topsoil stockpiles (tan) 1.47 0 1.47 <br />Stone Piles (Yellow) 2.10 0 2.10 <br />Partially reclaimed (green) 0.90 0 0.90 <br />Stone Storage (purple) 8.70 0 8.70 <br />ota isturbance 7 19.0 <br />(2) No reclamation was required this year in the slab stone mining <br />area. We are still actively working the 4 field stone areas <br />
The URL can be used to link to this page
Your browser does not support the video tag.