My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP49491
DRMS
>
Back File Migration
>
Report
>
REP49491
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:53:26 AM
Creation date
11/27/2007 12:36:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
11/1/1982
Doc Name
STIPULATION #5 TO ORCHARD VLY MINE PLAN PN C-038-81
From
COLO WESTMORELAND INC
To
MLRD
Permit Index Doc Type
SUBSIDENCE REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO WESTMORELAND INC. IIIIII~II~IIIIIIIII <br />P. O. Box E. Paonia, Colorado 81420 [] 303-527-4135 <br />October 29, 1982 <br />~EC~~v~® <br />N OV O 1 1982 <br />Ms. Sandra Emrich <br />Colorado Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />MINED LAND RECLAMATION <br />Colo. Dept. of Natural Resources <br />Re: Stipulation #5 to the Orchard Valley Mine Plan, Permit C-038-81. <br />Dear Sandy: <br />Enclosed is Colorado Westmoreland Inc.'s (CWI) subsidence report in <br />the format approved in your letter of August 9, 1982. In this report, <br />CWI has compiled all data available from surveys of subsidence monuments, <br />mine-inflow measurements, groundwater monitoring, and spring measure- <br />ments. <br />We've encountered a few stumbling blocks in obtaining information <br />for the hydrology portion of the report (inclement weather, poor access, <br />equipment malfunctions, etc.) and hope the data is adequate for this <br />first subsidence report. Amore detailed presentation of the hydrologic <br />regime of the Orchard Valley Mine will be presented in our annual hydrol- <br />ogy report on January 1, 1983. <br />It is CWI's understanding that these semi-annual subsidence reports <br />are due on May 1 and November 1 each year. We would like to request that <br />the May 1 reporting date be changed to August 1, and the November 1 date <br />to February 1. Surveying and monitoring are hampered in winter and <br />spring by mud, snow, rain, and cold. Late June and July are usually the <br />first times of the year when monitoring sites are accessible; therefore, <br />we would like to move the subsidence report due dates to August 1 and <br />February 1. <br />Another subject of concern to CWI is the requirement to address <br />stipulations regarding hydrology (Stipulations #10, #21, and #22) in the <br />subsidence report and the annual hydrology report. Since this informa- <br />tion will be thoroughly discussed in the annual hydrology report, we <br />would like to address hydrology generally in the subsidence report, and <br />only when it is determined that a water resource has played a role in a <br />subsidence event. <br />• <br />suesioiaar of <br />WESiM ORELANO <br />COAL COMPANY <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.