Laserfiche WebLink
<br /> <br />Notice of Intent to Continue Mining Operations <br />112 Annual Report <br />Permittee Name: Robinson Brick Company <br />Permit No: M-84-076 <br />Operation Name: DDD <br />Anniversary Date: 08/09/93 <br />Total: $550.00 (Due on your Anniversary Date) <br />Has this mine been granted TEMPORARY CESSATION STATUS? <br />Does this mine operate MORE or LESS than 160 days per year? <br />2a. Financial Warranty: $ S~~C 0 Q 2b. Permitted acreage: <br />3. Does this mine have a phased reclamation plan? <br />4. Total acres affected during the report year:' <br />5. Total acres reclaimed for the report year:` <br />YES ~~ <br />MORE LE <br />~ol,`~ <br />~E NO <br />2.2 <br />6. Total acres in various stages of reclamation:` <br />a. Backfilled: Z,~ d. Topsoil replaced: <br />b. Graded: 2~~ Average topsoil thickness <br />c. Seeded: ~ replaced: ~ <br />Ltst species seeded & seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:' ~ <br />8. Estimated total acres to be affected in the next report year:` ~_ <br />9. COMMENTS: ~0 l~itA+~iVt= iN W1AP ~M Pf~~lOJS `1EA(L <br />` Please show the location of the acreage for items 4 - 6 on your map" . <br />Indicate the phases of the reclamation which have been completed, .correlated with <br />your timetable. <br />".NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage 1n items 2 <br />through 6, then a new map is unnecessary. However, you must state this fact above. <br />Signature: Date: ~ <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: Michael Leidich Phone: (303)83- 30`/SC <br />Company: Rnhincnn Rrirk r4tnitan~ <br />Address: 1845 R' Dartmouth <br />Federal Tax ID No. or Social Security No.. <br />