4.4 Reclamation Accomplished 2003 - 2004 <br /> <br />During the 2003-2004 reporting year the following reclamation was conducted: <br />AMERICAN SODA, LLP <br />PICEANCE FACILITY <br />SPRING 2004 RECLAMATION <br />RECLAMATION APPLICATION <br />DATE: SUNDAY APRIL 25 -THURSDAY APRIL 29 <br />SEED MIXTURE TYPE: CRITICAL AREA STABILIZATION SEED MIX <br />LOCATION TYPE: ROAD CUTS/SHOULDERS & TOPSOIL <br />PILES <br />PERMANENT OR TEMPORARY: TEMPORARY <br />SEED APPLICATION: HYDROSEED <br />MULCH APPLICATION: HYDROMULCH <br />FERTILIZER: NITROGEN AND P2O5 18-46-0 <br />MULCH: 2 TONS/ACRE CONWED FIBERS <br />TACKIFIER: 100 LBS/ACRE M-BINDER <br />CONTRACTOR: BROWN'S ENVIRONMENTAL <br />CONSTRUCTION <br />Critical Area Stabilization Seed Mix was applied for temporary soil stabilization to <br />approximately 7 acres of land including road cuts/shoulders and topsoil piles where soil <br />stabilization was needed. This seed mix is specified in the "Soil Conservation, Erosion <br />and Sediment Control, Reclamation, and Re-vegetation Plan, Yankee Gulch Sodium <br />Minerals Project, April 1999." Areas reclaimed (as listed below) consisted of <br />approximately 50 sites ranging in size from 0.01 to 0.8 acres and located adjacent to <br />the main paved road into the Piceance Facility, the main gravel access road to the well <br />field, roads to the wells, adjacent to the well sites, and certain topsoil piles needing <br />additional reclamation. <br />AREA <br />Geoweb Erosion Control (3 experimental sites) <br />Well 11 <br />Well 11 Roadside <br />Well 11 Soil Pile <br />Well 12 Topsoil Pile Fenced <br />Well 20-6 Roadside <br />Well 20-6 Roadside <br />Well 20-6 Roadside <br />20-6 Well Pad remains open for test plot 210' x 15' <br />• {0.7 acres) <br />Main Gravel Roadside up from 20-6 <br />American Soda, L.L.P. 7 <br />DMG Annual Report <br />JWy 72, 2003 <br />WELL GRAVEL ROAD <br />:REAGE ACREAGE <br />0.02 <br />0.12 <br />0.04 <br />0.08 <br />0.14 <br />0.05 <br />0.18 <br />0.08 <br />