Laserfiche WebLink
immediately upstream of the mine, the sample site has been moved from its original location <br />within the Town of Nucla to the HDPE inlet structure located at the mine property boundary. <br />Monitoring of the CCC West Lateral Ditch downstream of the mine property at site SW-N105 <br />has been discontinued since the installation of the HDPE pipelines mentioned above in West <br />Lateral Irrigation Ditch - Fiow and Water Quality section eliminates the possibility any mine <br />water interacting with ditch water. Map 2.04.7-1A shows the new location of SW-N704. <br />Monthly flow, pH, temperature, and conductivity measurements will be taken at the four <br />monitoring locations to assess potential impacts of the mine and to fulfill the requirements for <br />the water augmentation plan. Water quality parameters listed in Table 2.04.7-2 will be collected <br />on a quarterly basis for SW-102, and on asemi-annual basis for the remaining four stations <br />(SW-N104, SW-N108 and SW-N109). The discharge point at Pond 007 will also be monitored <br />for NPDES requirements. <br />