Laserfiche WebLink
The Main Access Road has been consti <br />(Piceance Creek Road) to the Picear <br />Access Road is a 24-foot-wide aspl <br />shoulders. Disturbance associated wi <br />approximately 13 acres. The route of <br />Figure 1. <br />3.7 Test Mine Facility <br />American Soda'sTest Mine Facility is loc <br />year mining panel, and was constructe <br />both explore and better define the qual <br />resource and to refine the vertical cavity <br />in commercial operation. The Test Min? <br />pad, which measures approximately 13 <br />3.8 Additional Disturbance Planned for <br />As many as ten new solution mining we <br />reporting period. Four of these wells will I <br />remaining six would require construction <br />access any new well pads and Curren <br />these wells so no surface disturbance otl <br />anticipated. There are no other activitie <br />period that will create any additional dis <br />ed from Rio Blanco County Road 5 <br />Site Processing Facility. The Main <br />concrete road with 4-foot-wide <br />the construction of this road is <br />Main Access Road is provided in <br />~ted on the eastern edge of the 0 - 5 <br />in 1997 as a prospecting operation to <br />y and quantity of the nahcolite mineral <br />solution mining method currently in use <br />Facility was constructed on one large <br />cres in size. <br />- 2004 <br />may be drilled during the 2003 - 2004 <br />=placed on existing well pads and the <br />>f new well pads, Roads are in place to <br />well field piping is in place to service <br />=r than the possible six new well pads is <br />planned for the 2003 - 2004 reporting <br />~rbance. <br />American Soda, L.L.P. <br />DMG Annual Report <br />July 72, 2003 <br />