Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Waste Coal Pile Project No.: 95-2296 <br />Location: Foidel Creek Mine Report No.: 24 <br />Client: Bower Brothers Construction <br />Work Performed: <br />iii iiiiiiiiuiiiiii <br />Date: 7/2/97 <br />Time: 3.5 <br />Mileage: 40 <br />Engr./Tech: JK <br />As requested, we visited the project site on this date to conduct nuclear density test No.'s 96 through 99 on the <br />material placed. <br />Bower Brothers' crews placed and compacted processed waste coal in the northeast section of Area #2. 1Ne <br />obtained moisture samples from each test site and one sample for Checkpoint Proctor determination. The <br />Checkpoint matched curve No. 2 far this project. <br />Remarks: <br />The material tested generally met with project specifications. Compaction ranged from 91% to 96% and moisture <br />contents ranged from 1.6% to 4.2% below optimum. <br />Verbal Discussions: <br />Joe Bower of Bawer Brothers Construction was informed of today's test results. <br />