Laserfiche WebLink
/\/-~J`4 ~II ~I~~I~~I~~~~~~I~ iAL OFFICE$OAND PLANT <br />ASSOCI,4YED AGGREGM 1 ESQ ~P 999 ;qIG HTON ROAD . HENDERSON. COLORAD080640 <br />Q QUARRY (303)289-3316 <br />PIT LOCATION <br />33501 STATE HWV.6 IDAHO SPRINGS, COLO. 80452 <br />(303)571-5164 <br />June 12, 1987 <br />Mrs. Diane Bills <br />Colorado Mined Land Reclamation Board <br />1313 Sherman Street, Suite 215 <br />Denver, Colorado 80203-2273 <br />Dear Mr. Bills: <br />Re Associated Aggregates, Inc, <br />Walstrum Mine, M.L.R. Permit <br />No. 83-33, Annual Report <br />Our files indicate that the anniversary date for this permit is <br />June 23. Operation continued as approved in the July, 1985 Amendment. <br />This is a quarry operation so we remove large amounts of material <br />without disturbing large amount of land. Please refer to the <br />Annual Report map for the locations of areas discussed in this report. <br />We will deal specifically with each of the Annual Report <br />questions as outlined in Section 2.41 of the Rules and Regulations. <br />2.41 (1) No new land was disturbed this year mining continued in <br />the area previously disturbed. We currently have 4.70 <br />acres ± stripped (brown). We increased the mined area <br />by 1.10 acres ± (yellow) bringing the total area being <br />mined to 2.39 acres ± Total disturbance to date in <br />Stage 1 is 10.77 acres ±. Backfilling began in the <br />upper part of Stage 1 as approved. Stages X and Y are <br />still in use; with backfilling in Stage X still continuing. <br />Storage of growth medium continued on Stage A this year. <br />(2) No reclamation was required during this time period. <br />(3) Backfilling is the only reclamation performed. Partial <br />backfilling has continued in Stages X and Z. Backfilling <br />started this year in Stage 1 as approved (blue). <br />(4) Not applicable. <br />(5) Not applicable. <br />(6) The backfilling has been successful. <br />