Laserfiche WebLink
New Elk Mine <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />Mine: NEW ELK <br />Waste Bank MSHA ID. No.: Primary Refuse Disposal Area (RDA) <br />Inspection Period: First Quarter 2007 <br />Inspection Date: 3/302007 <br />General Description or Reference to Site Plan: <br />The Refuse Disposal Arm is kx~ted north of State Highway 12 and the Middle Fork of the <br />Purgatoire Rives. Refuse was transported from the preparation pint to the RDA by conveyor belt <br />The plant has been klle since March of 1996 at which time the host refuse was piaoed on the <br />fill area. <br />Activity During inspection: <br />No activity occurred during the inspection. <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdram oonstrudion and/ <br />or discharge, integrity of 100-year 24-hour drainage structures, and evidence of positive drainage). <br />No springs or seeps were observed on the refuse side slopes. Positive drainage is estabfished on <br />all areas. Vegetation is well established on previously reclaimed areas. <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and construction methods). <br />Page 1 of 2 <br />