Laserfiche WebLink
<br /> <br /> <br />At the time of our visit on July 10, 1995, the convactor had completed the installation of appro~timately <br />360 feet of toe drain at [he north end of the pile. The drain rock had been covered with an additional <br />layer of fdter fabric and several loads of gravel were placed on top of the fabric to keep it is place. <br />Based on our measurements, it appeazed that the convactor had increased the height of the drain rock <br />to at least 3 fee4 as previously recommended. Photographs of the completed toe drain (Photos #7 & <br />#g), taken on July 10, 1995, are attached. <br />Based on our observations and part-time inspections made at the project site, we believe that the outlet <br />drain and the fast 360 feet of toe drain, from the north end of the pile, were constructed in general <br />accordance with the project plans and specifications. <br />If you have any q[~~4ions regazdi[)~ this report or our observations, please contact this office. <br />Sincerely, <br />INC., <br />Brian D. <br />25150 <br />cc: xarl <br />Job Na. 952296 Nonhaest Colorado Consulun[s, Ine. Page 2 <br />