Laserfiche WebLink
Review Checklist for Subsidence Monitoring Report <br />Mine: FOldel Creek Date this review was completed: December 15, 2004 <br />Permit No.: C-82-056 CDMC reviewer: Byron G. Walker <br />Report period: 1st half 2004 <br />Panel(s) mined during report period: 15 and 16 Right <br />This monitoring report covers that period of time where portions of the 15 Right and 16 Right <br />panels of the Northern Mining District were undermined [see Subsidence Map First Half 2004 <br />of the report (2004 Map)]. <br />Monitoring requirement <br />(regulation citation) <br />Permit requirement In <br />compliance: <br />Comment <br /> Yes / no . <br /> PAP, pages 2.05- Previous subsidence monitoring <br /> 184.10 and 2.05-191.4. has demonstrated that subsidence <br />2.05.6(6)(c)(i)(A) The requirement of this predictions were conservative and <br />Monuments shall be rule has been limited to provided acceptable descriptions <br />installed and surveyed monitoring of selected <br />Yes of expected subsidence. This <br />prior to the structures and report indicates that maximum <br />commencement of renewable resource subsidence reports were <br />mining lands. See Rule approximately 15% more than <br /> 2.05.6(6)(c)(i)(C) anticipated, but overall, <br /> below. correlation was ood. <br />2.05.6(6)(c)(i)(B) pAP, page 2.05-184.10. <br />Monuments shall be The requirement of this <br />situated to appropriately rule has been limited to Total surface strain was <br />monitor ground surface monitoring of selected determined by locating <br />movement, vertical and structures and monuments at expected points of <br />horizontal, within the renewable resource Yes minimum strain (over gateroads), <br />area proposed to be lands as for the rule maximum strain (over mid- <br />undermined, including above. See Rule panel), and in areas of transition. <br />an area to accommodate 2 05.6(6)(c)(i)(C) <br />the predicted angle-of- below. <br />draw. <br />2.05.6(6)(c)(i)(C) The PAP, pages 2.05- <br />orientation, location and 184.10 and 2.05-191.4, <br />and the 2004 Map. <br />A section of the Union Pacific <br />elevation of each Only those structures Yes Railroad and a section of Fish <br />structure within the Within the approved Creek were undermined. <br />permit and adjacent affected area are <br />urea shall be monitored. monitored. <br />2.05.6(6)(c)(i)(D) PAP, page 2.05-185 <br />Monitoring of Monitoring was Monitoring of the railroad track <br />established monuments accomplished at least was accomplished approximately <br />and structures shall be quarterly, scheduled by <br />Yes once a week for three weeks <br />performed at least time mining progress. (report, page 4). The section of <br />quarterly, commencing As an example, Station Fish Creek was surveyed before <br />one month prior to the 415 (center of Panel and after undermining. <br />initiation of minin 16) was surveyed <br />