Laserfiche WebLink
1lonitorint:: <br />Grevsume Consultants will complete soil nuiricnt and vegetative assessments in October <br />20(12. The report is expected to he available to the Division on Kovember 1.2002. <br />Conclusion: <br />This project is NiC'C's f lest reclamation project of mine portals and is expected to provide <br />an example for similar ponul reclamation in the future at the \Vest Llk \tinc. The <br />project was uniyuc from the standpoint ot'special construction techniques employed that <br />allow tier greater vegetative production, species diversit}•, and densities on steep slopes. <br />7 he results? R'uIL..Lct's watch tl~ent grew' <br />Photo No. 9, Sediment control barricade fencing. and germination, September 2~1, 2002, <br />(looking east). Photo: MCC <br />Sediment control was accomplished h}' placing silt fencing ut the hose of the slopes <br />where no blanket was applied. Silt fencing and the blanketed portion had harricade <br />fencing erected to help control grtuing and errant :\TV trat7ic. The diuh at the base of <br />the slope and aJjaccnt to the road had strawbale sediment traps placed approximately <br />every 300 feet. The ditch and road also had seed attd Ceriilirer applied to enhance <br />reclamation to a "t.vo-track" condition of the roadway. <br />