Laserfiche WebLink
<br /> <br />~_ ~ <br />e . ^~ 'w,aT . ~ .. F• ` w- a ~r rye °. ~+~ <br />~ ( ~ r , _~'~, yy' ~ A i .pit , .~i <br />I'hutu i\u. b, l uurte~y i~t Cl1\1V. Jtm Liuruell. Juue l~, 2001, twine Pine Fan Facility <br />(loi~king +vest). <br />Reclamation: <br />Kcclamation of the arch conunenced in April 2002 aticr the structures were removed. <br />Liyuipmcnt selected titr the earthwork consisted of a D-R Uozcr ++•ith a u raper <br />attachment, a U-8 dozer with blade, D-S dozer, track excavator, and vibraton• compactor. <br />the D-R dozer with scraper ++w wed to build the slope back to approximate original <br />contour with the D-8 dozer with blade assisting. 'hhe vibratory compactor was used to <br />compact cash scraper load or liti added to the slope. The track excavator was used to <br />install culvert, construct ditches, and load the scraper with topsoil. The D-8 dozer ++ith <br />blade mtd the U-~ dozer with blade were utilized to dress the slope, spread topsoil, and <br />"yuarter-track" the topsoiled stops. at final configuration. <br />Approximately 2.0 acres ot'arca were reclaimed at the portal strew, another O.S ncrc was <br />reclaimed at the topsoil pile borrow area and 2.0 acres were reclaimed along the pipeline <br />and po+verline corridor. 13roadcstst seeding, fertilir.ing, mulching, and aspen blanket <br />installation began on ~tny 17. '002 and ++as completed stay 24, 2002. :lpproxintately <br />LO acre had aspen shaving blanket applied on the steeper sections ot'the slope. 1-hc <br />