My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP48867
DRMS
>
Back File Migration
>
Report
>
REP48867
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:52:40 AM
Creation date
11/27/2007 12:25:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Report
Doc Date
4/6/1994
Doc Name
1993 ANNUAL RECLAMATION REPORT TABLE OF CONTENTS
Permit Index Doc Type
ANNUAL RECLAMATION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following data shows the latest calculated annual sediment delivery and existing <br /> capacity. <br /> <br /> Sediment Survey Results <br /> Pond Tear Surveyed Caoaci[v (ac-ft) Avg. Tearly Sediment ( ac-ft) <br /> <br /> 002 1993 186. 26 0.15 <br /> 003 1993 5. 06 0.003 <br /> 004 1993 8. 28 0.12 <br /> 008 1493 6. 98 0.05 <br /> Based on the above, Peabody recommends the next sediment survey be conducted in 1996. <br />Stock Tanks <br />Peabotly is required by Permit C-80-005, Appendix 13-9 (from iR-21) [o provide as-built <br />drawings for all temporary stock tanks that were constructed in the previous year. <br />Several stock tanks at Seneca Il were constructed or reconstructed during 1993. At years <br />end, none of the above-mentioned ponds were 100 percent complete or design considerations <br />had not been completely verified. Therefore, no as-built certifications are inlcuded with <br />this annual report. <br />Peabody has also initialed an in~house program [o determine which ponds are functioning as <br />des i9ned, or functioning as anticipated. Review of the data collected by the hydrologists <br />and field inspections will help determine which (if any) stock tanks should be eliminated <br />from the system. Ponds which are completed in 1994 will be certified and the as-builts <br />will be submitted in the next annual reclamation report. <br />• <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.