Laserfiche WebLink
Doc Date <br />`t1~el~ <br /> I/~ ^ __ l <br />1 ~11~ ` <br />~~ <br /> 1993 ANNUAL RECLAMATION REPORT <br /> `l <br />~ <br /> Table of Contents <br /> Paae <br /> 1993 Disturbance Area 1 <br /> Backfilling and Grading 1 <br /> Soil and Spoil Monitoring 1 <br /> Soil Recovery Documentation 1 <br /> Soil Pit - Soil Fertility - Spoil Quality 2 <br /> Spoil Sampling in the Lennox Highuall Reduction Area 2 <br /> Wolf Creek Spoil 2 <br /> Soil Replacement Thickness 3 <br /> Soil Balance 3 <br /> Soil Salvage and Storage L <br /> Sail Redistribution Thickness - L <br /> Soil Replacement Technique 7 <br /> Summary 7 <br />• Revegetation 8 <br /> Seeding and Planting 8 <br /> need Control 11 <br /> Monitoring 12 <br /> Grazing 12 <br /> Chronological History of Revegetation 13 <br /> Sedimentation Pond Surveys 13 <br /> Stock Tanks 14 <br /> Literature Cited 13 <br /> List of Tables <br /> Paae <br /> Table 93.1 Salvageable Soil by Soil Map Unit from the <br /> Remaining Disturbance Area for Permit L-BO-005, <br /> January 1, 1994-1997 ~ 5 <br /> Table 93.2 Soil Stockpile Volumes as of December 31, 1993 6 <br /> Table 93.3 Seed Mix No-3 Temporary Stabilization of Topsail <br /> Stockpiles 9 <br /> cable 93.4 1993 Shrub and Tree Planting/Seeding Summary 10 <br /> <br />III IIIlllllllllllll <br />