Laserfiche WebLink
<br />As suggested in our previous quarterly report, the water levels in the monitor wells installed on October 23, <br />1997 and December 9, 1999 were measured during this quarter on a monthly basis. A table/gtaph showing <br />the monthly water levels is attached. <br />We were advised that the mine had placed approximately 41,550 cubic yards of waste coal in the pile <br />during the month of January 2004: 30,750 cubic yards during February 2004: and approximately 38,650 <br />cubic yards during March 2004. It is our understanding that the fines being produced at the wash plant are <br />being pumped underground into the mine. <br />This report fulfills <br />4.10.2(2)(a). If you <br />Sincerely, <br />NORTHWEST <br />D. Len, <br />cc: Tom <br />Job Number: 99.3983 <br />quazterly inspection requirements as specified by Rules 4.09.1(11)(a) and <br />any questions regarding this report or our observations, please contact this office. <br />TANTSS, INC., <br />& Geology <br />NWCC, [nc. <br />Page 2 <br />