Laserfiche WebLink
NCEC-1988 Hydrology Rpt -6- July, 1989 <br />3.0 PROJECT WATER BALANCE <br />3.1 Vulcan Ditch <br />Flow in the Vulcan Ditch began on June 13, 1988 and continued <br />steadily through October 30, 1988 with a few days down for <br />repairs. Since the mine operation was suspended throughout 1988, <br />all water diverted by the Vulcan Ditch was used exclusively for <br />agricultural purposes. Diversions to the ditch were as listed <br />below: <br />June 13 - October 30, 1988: <br />3.2 Agricultural Uses <br />967 Ac -Ft <br />Total: 967 Ac -Ft <br />As stated above, all diversions from the Vulcan Ditch during 1988 <br />were for agricultural purposes. <br />3.3 Mine Uses <br />The Coal Ridge No. 1 mine did not use any water during 1988 since <br />operations were in temporary suspension. No discharges were made <br />by the mine during this time period. <br />New Castle Energy Corporation <br />